Subtractive manufacturing for technical components — milled, turned, and finished to the dimensional, geometric, and surface requirements stated on your controlled drawing. Each program runs against a frozen drawing revision, with first-article verification, in-process control, and documented inspection evidence at release. Prototype, NPI, and series production are handled within the same quality framework.

Capabilities below are stated as drawing-quoting baselines. Tighter limits are achievable on critical features following process engineering review.
| Parameter | Milling | Turning |
|---|---|---|
| General tolerance | ±0.02 mm | ±0.01 mm |
| Tight tolerance (on request) | ±0.005 mm | ±0.005 mm |
| Surface finish (Ra) | 0.8 – 3.2 µm | 0.4 – 1.6 µm |
| Geometric tolerancing | GD&T per ASME Y14.5 | GD&T per ASME Y14.5 |
| Maximum work envelope | 600 × 400 × 300 mm | Ø 200 × 500 mm |
| Axis configuration | 3- / 4- / 5-axis simultaneous | 2-axis with driven tooling |
| CAM & verification | Solid-model toolpath, post-verified | Solid-model toolpath, post-verified |
Material is qualified to the drawing callout. Mill certificates are supplied on request for regulated programs (medical, aerospace, defence). RoHS and REACH compliance confirmed where stated. Sub-grade, temper, and form selected against the application — not a generic catalogue.
| Category | Grades / Forms |
|---|---|
| Aluminium alloys | 6061-T6, 6082-T6, 7075-T6, 2024-T3, 5052-H32 — bar, plate, billet |
| Carbon & alloy steel | EN1A, EN8, EN24, 4140; A2 / D2 / H13 tool steels |
| Stainless steel | 303, 304, 316L, 17-4 PH (H900 condition) |
| Copper alloys | Brass (C360 / C385), bronze (C932), copper (C110) |
| Engineering plastics | POM (Delrin), PEEK, PTFE, Nylon 6/66, PC, UHMW-PE, PMMA |
| Specialty (on request) | Ti-6Al-4V (Grade 5), Inconel 625 / 718, glass-filled composites |
Quality is delivered as documentation, not assurance. Every program defines its inspection frequency, equipment, and acceptance criteria at quote stage — and ships with the records.
Full dimensional verification against the controlled drawing — including GD&T callouts, surface finish, and material certification — completed and signed off before run release. Records included with first shipment.
Critical-feature sampling against statistical process-control limits during the run. Trend deviation flagged in real time; out-of-control parts isolated and re-inspected before release downstream.
Coordinate-measuring (CMM) reporting for complex geometries or critical-to-function features. Final release dimensional data supplied per lot. PPAP-style documentation packs available on request.